Construction Progress Continues at Marmalade Lane with DOBA Leading Civil and Structural Design

Construction at Marmalade Lane is moving steadily forward, with a new video update from DOMU offering a behind-the-scenes look at progress on site.

DOBA are proud to be delivering Civil and Structural Engineering services for the development, supporting the delivery of high-quality, sustainable housing. The engineering design is being led by Paul Doyle, Associate Director at DOBA, who is overseeing the project on behalf of the firm.

The development is designed with a strong focus on community and livability, aligning with DOBA’s commitment to engineering spaces that are both functional and people-centred.

The latest visuals from DOMU reflect the collaborative effort driving the project forward, as construction continues to bring the design vision to life.

To see the latest progress, check out the construction update video shared by DOMU https://www.linkedin.com/posts/domu-living-redefined_marmaladelane-domu2025-domu-ugcPost-7313138128913850368-oqC8?utm_source=share&utm_medium=member_desktop&rcm=ACoAAEbrvnsB5dtoRgvQe2kXI0ymXCT7-agVVGw

Share Post:

Related News

Corduff Park Upgrade

Corduff Park Upgrade

DOBA Supporting Major Upgrade Works at Corduff Park, Dublin 15 Construction is now underway on the major upgrade of Corduff Park in Dublin 15, a

Scroll to Top